50 YEARS OF PITT PIPELINE

Celebrate 50 years of Pitt Pipeline with a collection of photos archived from our companys history. Thank you for half a century and beyond of continued support!

Home → 50 Years of Pitt Pipeline

ARCHIVED PICTURES

View photos of Pitt Pipeline at work from our company’s earliest years, presented and preserved digitally for the first time.

View photos of Pitt Pipeline at work from our company’s earliest years, presented and preserved digitally for the first time.

If you, your friends, or your family have memories working with Pitt Pipeline, visit our Facebook page and tag us to have your pictures featured!

MAGAZINE FEATURES

Various appearances of our company and crew featured in print media.

New England Construction

March 13, 1978

The cover of an issue of New England Construction, published March 13, 1978. This is Jerry Pittorino’s personal copy, as indicated by his signature.

Construction Outlook

December 1981

The cover of the December 1981 issue of Construction Outlook magazine, headlining the Utility Contractors’ Association of New England, Inc. (UCANE) 27th Annual Banquet.

Construction Outlook

February 1984

Jerry Pittorino (referred to as Gerald Pittorino; pictured left) featured on the cover of the Construction Outlook magazine’s February 1984 issue, denoting his then-new position as Secretary of UCANE.

Construction Outlook

February 1985

Jerry Pittorino (referred to as Gerald Pittorino; pictured left) featured on the cover of the Construction Outlook magazine’s February 1985 issue, denoting his re-appointment as Secretary of UCANE.

New England Construction

December 25, 2000

The cover of the December 25, 2000 issue of New England Construction. With the turn of the millennium, Jay Pittorino, Jerry’s son, would play a more prominent role in Pitt Pipeline, with Jerry retaining his role as company President and son, Jay, as Vice President.

New England Construction

October 27, 2008

The cover of the October 27, 2008 issue of New England Construction. Thirty years after Pitt Pipeline’s debut feature in New England Construction in 1978, the company is now headed by Jay Pittorino.

DID YOU KNOW?

The first piece of equipment purchased and fully owned by Pitt Pipeline is the 1978 350-H Bucyrus-Erie Hydraulic Excavator[1]. This range was produced by the South Milwaukee-based manufacturer from 1975 to 1986, featuring a strikingly angular cab design befitting the Space Age craze of the latter half of the 20th century.

Upon its debut, the 350-H had three engine options corresponding to operators' power needs and budgets: the GM6V92, the CUM VT 903, and the GM8V71. The latter two trims were 8-cylinder engines with a shared net horsepower of 250 and RPMs of 2350 and 2100, respectively. In practice, the improved versatility of the piston pumps and joystick controls within the “comfort-cab” allowed the Bucyrus-Erie 350-H to serve as an important stepping stone for how excavators are manufactured and operated today[2].

Of relevance to Pitt Pipeline, Jerry Pittorino purchased the Bucyrus-Erie 350-H in 1977, two years after the company’s founding. With much of Pitt Pipeline’s existing equipment originating from Pitt Construction, this would prove to be the fledgeling company’s first wholly-owned excavator. The following year, in 1978, Jerry would purchase an additional 350-H excavator for Pitt Pipeline. Both excavators would see consistent use by the company for nearly three decades, becoming vital pieces of equipment for every project.

Today, both Bucyrus-Erie 350-H excavators reside in Rindge, New Hampshire, following nearly 50 years of operation under Pitt Pipeline. According to Jay Pittorino in a Facebook post, while their age has affected how long these excavators can run in a given session, both models are otherwise still fully functional and operational as of November 6, 2025, 48 years after the initial purchase.

Despite the equipment’s age, the Bucyrus-Erie 350-H has proven to be a hallmark of Pitt Pipeline’s history, persisting nearly half a decade with well-deserved care and respect.

Sources:

[1] Pitt Pipeline Company, Inc. (2025, November 6). 1978 350H Bucyrus-Erie. In 1977, my grandfather, Jerry Pittorino bought his first excavator for Pitt Pipeline….the 350H. The next year[…]” [Three Images]. Educational. Facebook. https://www.facebook.com/share/p/1Emn9RBq8f/


[2] diecastmania. (2016, September 25). Bucyrus Erie “New” 350-H Brochure, Conexpo 1975 [Video]. YouTube. https://www.youtube.com/watch?v=jVeGR4djSFs

DID YOU KNOW?

The first piece of equipment purchased and fully owned by Pitt Pipeline is the 1978 350-H Bucyrus-Erie Hydraulic Excavator[1]. This range was produced by the South Milwaukee-based manufacturer from 1975 to 1986, featuring a strikingly angular cab design befitting the Space Age craze of the latter half of the 20th century.

Upon its debut, the 350-H had three engine options corresponding to operators' power needs and budgets: the GM6V92, the CUM VT 903, and the GM8V71. The latter two trims were 8-cylinder engines with a shared net horsepower of 250 and RPMs of 2350 and 2100, respectively. In practice, the improved versatility of the piston pumps and joystick controls within the “comfort-cab” allowed the Bucyrus-Erie 350-H to serve as an important stepping stone for how excavators are manufactured and operated today[2].

Of relevance to Pitt Pipeline, Jerry Pittorino purchased the Bucyrus-Erie 350-H in 1977, two years after the company’s founding. With much of Pitt Pipeline’s existing equipment originating from Pitt Construction, this would prove to be the fledgeling company’s first wholly-owned excavator. The following year, in 1978, Jerry would purchase an additional 350-H excavator for Pitt Pipeline. Both excavators would see consistent use by the company for nearly three decades, becoming vital pieces of equipment for every project.

Today, both Bucyrus-Erie 350-H excavators reside in Rindge, New Hampshire, following nearly 50 years of operation under Pitt Pipeline. According to Jay Pittorino in a Facebook post, while their age has affected how long these excavators can run in a given session, both models are otherwise still fully functional and operational as of November 6, 2025, 48 years after the initial purchase.

Despite the equipment’s age, the Bucyrus-Erie 350-H has proven to be a hallmark of Pitt Pipeline’s history, persisting nearly half a decade with well-deserved care and respect.

Of relevance to Pitt Pipeline, Jerry Pittorino purchased the Bucyrus-Erie 350-H in 1977, two years after the company’s founding. With much of Pitt Pipeline’s existing equipment originating from Pitt Construction, this would prove to be the fledgeling company’s first wholly-owned excavator. The following year, in 1978, Jerry would purchase an additional 350-H excavator for Pitt Pipeline. Both excavators would see consistent use by the company for nearly three decades, becoming vital pieces of equipment for every project.


Today, both Bucyrus-Erie 350-H excavators reside in Rindge, New Hampshire, following nearly 50 years of operation under Pitt Pipeline. According to Jay Pittorino in a Facebook post, while their age has affected how long these excavators can run in a given session, both models are otherwise still fully functional and operational as of November 6, 2025, 48 years after the initial purchase.


Despite the equipment’s age, the Bucyrus-Erie 350-H has proven to be a hallmark of Pitt Pipeline’s history, persisting nearly half a decade with well-deserved care and respect.

Of relevance to Pitt Pipeline, Jerry Pittorino purchased the Bucyrus-Erie 350-H in 1977, two years after the company’s founding. With much of Pitt Pipeline’s existing equipment originating from Pitt Construction, this would prove to be the fledgeling company’s first wholly-owned excavator. The following year, in 1978, Jerry would purchase an additional 350-H excavator for Pitt Pipeline. Both excavators would see consistent use by the company for nearly three decades, becoming vital pieces of equipment for every project.


Today, both Bucyrus-Erie 350-H excavators reside in Rindge, New Hampshire, following nearly 50 years of operation under Pitt Pipeline. According to Jay Pittorino in a Facebook post, while their age has affected how long these excavators can run in a given session, both models are otherwise still fully functional and operational as of November 6, 2025, 48 years after the initial purchase.


Despite the equipment’s age, the Bucyrus-Erie 350-H has proven to be a hallmark of Pitt Pipeline’s history, persisting nearly half a decade with well-deserved care and respect.

Sources:

[1] Pitt Pipeline Company, Inc. (2025, November 6). 1978 350H Bucyrus-Erie. In 1977, my grandfather, Jerry Pittorino bought his first excavator for Pitt Pipeline….the 350H. The next year[…]” [Three Images]. Educational. Facebook. https://www.facebook.com/share/p/1Emn9RBq8f/


[2] diecastmania. (2016, September 25). Bucyrus Erie “New” 350-H Brochure, Conexpo 1975 [Video]. YouTube. https://www.youtube.com/watch?v=jVeGR4djSFs

BEFORE PITT PIPELINE

The original Pitt Construction trailer truck used throughout the company's earliest years. Note the framed "PITT" logo on the grill of the truck as well as its sides.

Before establishing Pitt Pipeline in 1975, Jerry Pittorino was a co-owner of the Pitt Construction Corporation. Established in 1954 by Joseph Pittorino, Jerry’s father, Pitt Construction would be taken over by two of his sons, Phillip [Phil] and Jerry, by the following decade. Working in the same field and being mentored by their father, both of Joseph’s sons would inherit his upstanding work ethic and business acumen.

However, by 1974, after working at Pitt Construction since the age of 13, Jerry decided to establish his own subcontracting business. Utilizing equipment borrowed from his previous company and paying for all other expenses out of pocket, Jerry would establish Pitt Pipeline as we know it today in 1975, hosting roughly 11~15 employees by 1981.

Before establishing Pitt Pipeline in 1975, Jerry Pittorino was a co-owner of the Pitt Construction Corporation. Established in 1954 by Joseph Pittorino, Jerry’s father, Pitt Construction would be taken over by two of his sons, Phillip [Phil] and Jerry, by the following decade. Working in the same field and being mentored by their father, both of Joseph’s sons would inherit his upstanding work ethic and business acumen.


However, by 1974, after working at Pitt Construction since the age of 13, Jerry decided to establish his own subcontracting business. Utilizing equipment borrowed from his previous company and paying for all other expenses out of pocket, Jerry would establish Pitt Pipeline as we know it today in 1975, hosting roughly 11~15 employees by 1981.


Today, Pitt Construction still exists and is operated by Joe Pittorino, the son of Phil Pittorino. Nearly 70 years after its conception, the influence left by Joseph Pittorino’s company is unmistakable, pioneering the quality and professionalism standards exercised by Pitt Pipeline and Pitt Construction with every project. With the next generation of Pitt Pipeline underway, the legacy of Joseph Pittorino persists in balacing new, innovative ideas with timeless workmanship and quality.

One of the few surviving photographs of Jerry and Phil Pittorino working together at Pitt Construction. Taken from an unknown magazine, the article notes a sand digging job performed by the Pittorino brothers in Waltham, laying over 278 feet of pipe on Cedar Street.

Today, Pitt Construction still exists and is operated by Joe Pittorino, the son of Phil Pittorino. Nearly 70 years after its conception, the influence left by Joseph Pittorino’s company is unmistakable, pioneering the quality and professionalism standards exercised by Pitt Pipeline and Pitt Construction with every project. With the next generation of Pitt Pipeline underway, the legacy of Joseph Pittorino persists in balacing new, innovative ideas with timeless workmanship and quality.

Special thanks to Stacey Pittorino for proving the images for this section.

WHAT'S NEW?: RINDGE STONE & GRAVEL

Video by Lucas Audette (@lma.films)

In January 2021, Jay Pittorino purchased an abandoned stone quarry in Rindge, NH. Previously dormant for 15 years, Jay and the Pitt Pipeline crew redeveloped the quarry between other projects throughout the year, with the pit officially reopening shorty thereafter. Reestablishing Rindge Stone & Gravel, LLC., the Pitt Pipeline crew took what was once a dormant plot of land into a viable source of material for contractors, government agencies, and nearby residents.


Today, Rindge Stone & Gravel sells 16 different types of material, ranging from crushed stone to processed gravel and topsoil. After placing your order by email or phone, you can choose the delivery or pickup option that works best for you.

A comparison between Rindge Stone & Gravel in April 2020 (Top) to now (Bottom). It's come quite a long way since then!

Not sure what material you need? Rindge Stone & Gravel staff offers suggestions based on your project’s needs. You can also visit the quarry to see the material in person. The pit has been organized to be accessible and straightforward for all visitors, whether they are a professional or a new homeowner ordering material for the first time.


Jay’s ownership of Pitt Pipeline has granted the new business access to equipment otherwise unobtainable by a new owner without the same experience. For example, much of Pitt Pipeline’s older equipment has found a second life in Rindge Stone & Gravel, where it can remain effective in a less nomadic environment. Meanwhile, Pitt Pipeline can still access older equipment if needed while making room for cutting-edge equipment for commercial projects.


With the reestablishment of Rindge Stone & Gravel, the knowledge and reputation Pitt Pipeline has built can be applied in a business venture that complements what has been established while expanding to a broader market. Rindge Stone & Gravel is the latest in a lineage of quality workmanship spanning 70 years and counting.


To learn more about Rindge Stone & Gravel, please visit the company’s website and social media pages linked below.

Pitt Pipeline Company, Inc. 
25 Sullivan Road, Suite 7
North Billerica, MA 01862
Phone: (978) 362-1470

2026, Pitt Pipeline Company, Inc.

Designed by Henry Pittorino

50 YEARS OF

PITT PIPELINE

Celebrate 50 years of Pitt Pipeline with a collection of photos archived from our companys history. Thank you for half a century and beyond of continued support!

ARCHIVED PICTURES

View photos of Pitt Pipeline at work from back in the day, presented and preserved digitally for the first time.

If you, your friends, or your family have memories working with Pitt Pipeline, visit our Facebook and tag us to have your pictures featured!

FOLLOW US!

Home → 50 Years of Pitt Pipeline

50 YEARS OF

PITT PIPELINE

Celebrate 50 years of Pitt Pipeline with a collection of photos archived from our companys history. Thank you for half a century and beyond of continued support!

ARCHIVED PICTURES

View photos of Pitt Pipeline at work from back in the day, presented and preserved digitally for the first time.

If you, your friends, or your family have memories working with Pitt Pipeline, visit our Facebook and tag us to have your pictures featured!

FOLLOW US!

Home → 50 Years of Pitt Pipeline

ARCHIVED PICTURES

View photos of Pitt Pipeline at work from back in the day, presented and preserved digitally for the first time.

If you, your friends, or your family have memories working with Pitt Pipeline, visit our Facebook and tag us to have your pictures featured!

MAGAZINE FEATURES

Various appearances of our company and crew featured in print media.

New England Construction

March 13, 1978

Construction Outlook

December 1981

Construction Outlook

February 1984

Construction Outlook

February 1985

New England Construction

December 25, 2000

New England Construction

October 27, 2008

The cover of an issue of New England Construction, published March 13, 1978. This is Jerry Pittorino’s personal copy, as indicated by his signature.

The cover of the December 1981 issue of Construction Outlook magazine, headlining the Utility Contractors’ Association of New England, Inc. (UCANE) 27th Annual Banquet.

Jerry Pittorino (referred to as Gerald Pittorino; pictured left) featured on the cover of the Construction Outlook magazine’s February 1984 issue, denoting his then-new position as Secretary of UCANE.

Jerry Pittorino (referred to as Gerald Pittorino; pictured left) featured on the cover of the Construction Outlook magazine’s February 1985 issue, denoting his re-appointment as Secretary of UCANE.

The cover of the December 25, 2000 issue of New England Construction. With the turn of the millennium, Jay Pittorino, Jerry’s son, would play a more prominent role in Pitt Pipeline, with Jerry retaining his role as company President and son, Jay, as Vice President.

The cover of the October 27, 2008 issue of New England Construction. Thirty years after Pitt Pipeline’s debut feature in New England Construction in 1978, the company is now headed by Jay Pittorino.

DID YOU KNOW?

The first piece of equipment purchased and fully owned by Pitt Pipeline is the 1978 350-H Bucyrus-Erie Hydraulic Excavator.[1] This range was produced by the South Milwaukee-based manufacturer from 1975 to 1986, featuring a strikingly angular cab design befitting the Space Age craze of the latter half of the 20th century.

Upon its debut, the 350-H had three engine options corresponding to operators' power needs and budgets: the GM6V92, the CUM VT 903, and the GM8V71. The latter two trims were 8-cylinder engines with a shared net horsepower of 250 and RPMs of 2350 and 2100, respectively. In practice, the improved versatility of the piston pumps and joystick controls within the “comfort-cab” allowed the Bucyrus-Erie 350-H to serve as an important stepping stone for how excavators are manufactured and operated today.[2]

Of relevance to Pitt Pipeline, Jerry Pittorino purchased the Bucyrus-Erie 350-H in 1977, two years after the company’s founding. With much of Pitt Pipeline’s existing equipment originating from Jerry’s former, family-owned contracting company Pitt Construction, this would prove to be the fledgeling company’s first wholly-owned excavator. The following year, in 1978, Jerry would purchase an additional 350-H excavator for Pitt Pipeline. Both excavators would see consistent use by the company for nearly three decades, becoming vital pieces of equipment for every project.

Today, both Bucyrus-Erie 350-H excavators reside in Rindge, New Hampshire, following nearly 50 years of operation under Pitt Pipeline. According to Jay Pittorino in a Facebook post, while their age has affected how long these excavators can run in a given session, both models are otherwise still fully functional and operational as of November 6, 2025, 48 years after the initial purchase.


Despite the equipment’s age, the Bucyrus-Erie 350-H has proven to be a hallmark of Pitt Pipeline’s history, persisting nearly half a decade with well-deserved care and respect.

Sources:

[1] Pitt Pipeline Company, Inc. (2025, November 6). 1978 350H Bucyrus-Erie. In 1977, my grandfather, Jerry Pittorino bought his first excavator for Pitt Pipeline….the 350H. The next year[…]” [Three Images]. Educational. Facebook. https://www.facebook.com/share/p/1Emn9RBq8f/


[2] diecastmania. (2016, September 25). Bucyrus Erie “New” 350-H Brochure, Conexpo 1975 [Video]. YouTube. https://www.youtube.com/watch?v=jVeGR4djSFs

BEFORE

PITT PIPELINE

Before establishing Pitt Pipeline in 1975, Jerry Pittorino was a co-owner of the Pitt Construction Corporation. Established in 1954 by Joseph Pittorino, Jerry’s father, Pitt Construction would be taken over by two of his sons, Phillip [Phil] and Jerry, by the following decade. Working in the same field and being mentored by their father, both of Joseph’s sons would inherit his upstanding work ethic and business acumen.

Jerry Pittorino’s business card during his co-ownership of Pitt Construction. Also pictured are Jerry’s first business card as owner of Pitt Pipeline, and the business card of his son Jay, following his new role as Company President.

One of the few surviving photographs of Jerry and Phil Pittorino working together at Pitt Construction. Taken from an unknown magazine, the article notes a sand digging job performed by the Pittorino brothers in Waltham, laying over 278 feet of pipe on Cedar Street.

However, by 1974, after working at Pitt Construction since the age of 13, Jerry decided to establish his own subcontracting business. Utilizing equipment borrowed from his previous company and paying for all other expenses out of pocket, Jerry would establish Pitt Pipeline as we know it today in 1975, hosting roughly 11~15 employees by 1981.


Today, Pitt Construction still exists and is operated by Joe Pittorino, the son of Phil Pittorino. Nearly 70 years after its conception, the influence left by Joseph Pittorino’s company is unmistakable, pioneering the quality and professionalism standards exercised by Pitt Pipeline and Pitt Construction with every project. With the next generation of Pitt Pipeline underway, the legacy of Joseph Pittorino persists in balacing new, innovative ideas with timeless workmanship and quality.

Special thanks to Stacey Pittorino for proving the images for this section.

The original Pitt Construction trailer truck used throughout the company's earliest years. Note the framed "PITT" logo on the grill of the truck as well as its sides.

WHAT'S NEW?: RINDGE STONE & GRAVEL

Video by Lucas Audette (@lma.films)

In January 2021, Jay Pittorino purchased an abandoned stone quarry in Rindge, NH. Previously dormant for 15 years, Jay and the Pitt Pipeline crew redeveloped the quarry between other projects throughout the year, with the pit officially reopening shorty thereafter. Reestablishing Rindge Stone & Gravel, LLC., the Pitt Pipeline crew took what was once a dormant plot of land into a viable source of material for contractors, government agencies, and nearby residents.

A comparison between Rindge Stone & Gravel in April 2020 (Top) to now (Bottom). It's come quite a long way since then!

Today, Rindge Stone & Gravel sells 16 different types of material, ranging from crushed stone to processed gravel and topsoil. After placing your order by email or phone, you can choose the delivery or pickup option that works best for you.


Not sure what material you need? Rindge Stone & Gravel staff offers suggestions based on your project’s needs. You can also visit the quarry to see the material in person. The pit has been organized to be accessible and straightforward for all visitors, whether they are a professional or a new homeowner ordering material for the first time.


Jay’s ownership of Pitt Pipeline has granted the new business access to equipment otherwise unobtainable by a new owner without the same experience. For example, much of Pitt Pipeline’s older equipment has found a second life in Rindge Stone & Gravel, where it can remain effective in a less nomadic environment. Meanwhile, Pitt Pipeline can still access older equipment if needed while making room for cutting-edge equipment for commercial projects.


With the reestablishment of Rindge Stone & Gravel, the knowledge and reputation Pitt Pipeline has built can be applied in a business venture that complements what has been established while expanding to a broader market. Rindge Stone & Gravel is the latest in a lineage of quality workmanship spanning 70 years and counting.


To learn more about Rindge Stone & Gravel, please visit the company’s website and social media pages linked below.

Pitt Pipeline Company, Inc. 
25 Sullivan Road, Suite 7
North Billerica, MA 01862
Phone: (978) 362-1470


2026, Pitt Pipeline Company, Inc.

Designed by Henry Pittorino

Pitt Pipeline Company, Inc. 
25 Sullivan Road, Suite 7
North Billerica, MA 01862
Phone: (978) 362-1470


2026, Pitt Pipeline Company, Inc.

Designed by Henry Pittorino